Description:
Lean manufacturing has been widely applied in the industry as an effort to utilize resources efficiently
and systematically. The purpose of this study is to analyze waste time activities and to proposed
minimize the time so it will increase the effectiveness of production sucralfate suspension at PT. X.
The concept used in this research is lean manufacturing with a value stream mapping (VSM) approach.
This method will make it easier to identify waste time activities through current state mapping, to
determine improvement points and to propose improvements by describing the value stream mapping.
The research was carried out by calculating and mapping each step of the production of sucralfate
suspension. The total production time needed for the production of one batch of sucralfate suspension
is 5 hours 16 minutes with a value added activity time about 96%, and a necessary non value added
activity time about 4%. The proposed improvement to minimize waste time is by carrying out
productions activities in parallel. Based on the proposed improvement, the total production time of
sucralfate syrup that can be reduced is 31 minutes.
URL:
http://103.158.96.210:88/web_repository/uploads/34905-170554-2-PB.pdf
Type:
Journal
Document:
Diploma III Farmasi
Date:
23-06-2024
Author:
NALIA E ISMAIL